Cantonal Hospital of St. Gallen, Switzerland

Incineration plant for hospital waste
 
 
 

Model:

MZ 8

Capacity:

100 kg/h

Purpose:

Hospital waste

Delivered:   

2011


ECO Profe, Kazakhstan

Incinerator for hospital waste
 
 
 

Model:

MZ 10

Capacity:

100 kg/h

Purpose:

Hospital waste

Delivered:   

2011


Batrec Industry, Wimmis, Switzerland

Post combustion for hazardous metalliferous waste recycling
 
 
 

Model:

NBK5 & MBK3

PCC Capacity:

5’000 Nm3/h each

Purpose:

Industrial waste

Delivered:   

2011


Lybia

Incinerator for hospital waste
 
 
 

Model:

MZ 5

Capacity:

500 kg/day solid waste

Purpose:

Hospital waste

Delivered:   

2011


Hospital Myjava, Slovakia

Incineration plant for Hospital waste
 
 
 

Model:

MZ 7

Capacity:

100 kg/h

Purpose:

Hospital waste

Delivered:   

2010


SVPA Lausanne, Switzerland

Incineration plant with Heat Recovery and flue gas treatment
 
 
 

Model:

MZ 10

Capacity:

100 kg/h

Purpose:

Animal crematorium

Delivered:   

2009


Plovdiv, Bulgaria

Incineration plant for hospital waste
 
 
 

Model:

CS 14

Capacity:

300 kg/h

Purpose:

Hospital waste

Delivered:   

2009


Vietnam

Incinerator
 
 
 

Model:

2x MZ 4

Capacity:

500 kg/day solid waste

Purpose:

Hospital waste

Delivered:   

March 2008


Libya

Incinerator for hospital waste
 
 
 

Model:

MZ 8

Capacity:

100 kg/day

Purpose:

Hospital waste

Delivered:   

June 2008


Trnava, Slovakia

Hospital waste incineration plant
 
 
 

Model:

GG 7

Capacity:

150 kg/h

Purpose:

Hospital waste

Delivered:   

May 2008


Oman

Incinerator for hospital waste
 
 
 

Model:

MZ 5

Capacity:

600 kg/day

Purpose:

Hospital waste

Post combustions:  

1000° C / 1,0 sec

Delivered:   

June 2008


Pluspetrol, Camisea, Peru

Incinerator with heat recovery
 
 
 

Model:

2x MZ 4

Capacity:

500 kg/day solid waste

Purpose:

Oil industrial waste

Delivered:   

March 2007


Metalor Marin, Switzerland

Incinerator plant for precious metal refining
 
 
 

Model:

MZ 4

Capacity:

100 kg/day solid waste

Purpose:

precious metal refining

Delivered:   

March 2007


Cadca, Slovakia

Hospital waste incineration plant
 
 
 

Model:

GG 7

Capacity:

150 kg/h

Purpose:

Hospital waste

Delivered:   

November 2007


Tecpetrol Peru Corp. S.A., Peru

Incinerator with post combustion
 
 
 

Model:

MZ 8

Capacity:

150 kg/h

Purpose:

Hospital waste

Delivered:   

November 2007


Silvretta Seilbahn AG Ischgl, Austria

Incinerator with heat recovery
 
 
 

Model:

GG 7

Capacity:

150 kg/h solid waste

Purpose:

Catering waste

Delivered:   

September 2007


Ecolog International Mazar-e-Sherif, Afghanistan

Incinerator with post combustion for solid & liquid waste
 
 
 

Model:

MZ 10 + LI 50

Capacity:

100 kg/h solid waste - 50l/h liquid waste

Purpose:

For military camps

Delivered:   

August 2006


Gremolith AG Bazenheid, Switzerland

Incineration plant and air
 
 
 

Model:

-

Capacity:

5000 Nm3/h

Purpose:

Regeneration of active carbon filter

Delivered:   

June 2006


Ecolog International, Bagdad, Iraq

Incinerator with post combustion for solid & liquid waste
 
 
 

Model:

MZ 10 + LI 50

Capacity:

100 kg/h solid waste - 50l/h liquid waste

Purpose:

For military camps

Delivered:   

May 2006


Hoval Werke, Vaduz, Liechtenstein

Incinerator with post combustion
 
 
 

Model:

2 pieces MZ 4

Capacity:

50 kg/h

Purpose:

Hospital waste

Delivered:   

December 2005


Environment & Protection Dept., Libya

Incinerator with post combustion for hospital waste
 
 
 

Model:

2 pieces GG 7

Capacity:

2x 1500 kg/day

Purpose:

Hospital waste

Delivered:   

November 2008


Bac Lieu Hospital & Ha Tien Hospital, Vietnam

Incinerator with post combustion for hospital waste
 
 
 

Model:

2 pieces MZ 8

Capacity:

2x 800 kg/day

Purpose:

Hospital Waste

Delivered:   

October 2005


Ecolog, Afghanistan

Incinerator with post combustion for solid & liquid waste
 
 

Model:

2 pieces MZ 10 + LI 50

Capacity:

100 kg/h solid waste

50l/h liquid waste (old oil)

Purpose:

For military camps

Delivered:   

September 2005


Hotel Palace, St. Moritz, Switzerland

Incinerator with post combustion chamber
 
 
 

Model:

DS 06

Capacity:

1,8t/day

Purpose:

Hospital waste

Delivered:   

August 2005


Sulzer Brazil S.A. La Rioja, Argentina

Incinerator with post combustion
 
 
 

Model:

MZ 4

Capacity:   

50 kg/h

Purpose:

Industrial waste

Delivered: 

June 2005


Mother & Child Hospital, Astana, Kazakhstan

Incineration with post combustion
 
 
 

Model:

MZ 7

Capacity:   

100 kg/h

Purpose:

Hospital waste

Delivered: 

May 2005


Fakultini Nemocnice V. Motole, Praha Czech Republic

Incineration plant with static combustion chamber, post combustion chamber and heat recovery
 
 
 

Model:

2x GG 24

Capacity:   

2x 450 kg/h

Purpose:

Hospital waste

Delivered: 

April 2005


Matsuda Sangyo CO. LTD., Japan

Replacement of the primary chamber
 
 
 

Model:

GG 24

Capacity:   

2.4 MW

Purpose:

Metal recovery

Delivered: 

March 2005


WHO, World Health Organization

Hospital waste for Baghdad, Mosul, Najef, Basrah
 
 
 

Model:

4 pieces MZ 2

Capacity:   

25 kg/h

Purpose:

Hospital waste

Delivered: 

August 2004


Pan American Energy, Argentina

Tecpetrol S.A., Argentina
 
 
 

Model:

2 pieces MZ 7

Capacity:   

100 kg/h

Purpose:

Oil industry

Delivered: 

May 2004


Hotel Palace, St. Moritz, Switzerland

Complete dry flue gas treatment
 
 
 

Model:

FGT-DS 1400

Capacity:   

1600 Nm3/h

Purpose:

Hospital waste

Delivered: 

November 2003


Bojnice, Slovakia

Complete incineration plant with static combustion chamber and wet flue gas treatment
 
 
 

Model:

GG 7

Capacity:   

150 kg/h

Purpose:

Hospital waste

Delivered: 

October 2003


CFE, Baja California, Mexico

Complete incineration plant with static combustion chamber and wet flue gas treatment
 
 
 

Model:

MZ 7 + TR 24

Capacity:   

500 kg/h - 24h, 2.8MW

Purpose:

Crude oil

Delivered: 

December 2003


Vinkovci, Croatia

Complete dry flue gas treatment for an existing incinerator
 
 
 

Model:

FGT-DS 1000.01

Capacity:   

1000 Nm3/h

Purpose:

Hospital waste

Delivered: 

July 2002


Batrec AG, Wimmis, Switzerland

Two post-combustion chambers for an existing incinerator
 
 
 

Model:

-

PCC Capacity:   

3’000 Nm3/h each

Purpose:

Batteries

Delivered: 

July 2002


Sicilia, Italy

Complete incineration plant with rotary kiln, heat revocery by diathermic oil and dry flue gas treamtent
 
 
 

Model:

RKp 13

Capacity:

300 kg/h - 24h, 1.6MW

Purpose:

Flours of animals

Delivered: 

2002


Italy

Complete incineration plant with static combustion chamber, heat exchanger and dry flue gas treatment
 
 
 

Model:

AWE

Capacity:

1000 kg/h

Purpose:

Sawdust

Delivered: 

2000


Animal carcass

Complete incineration plant with static combustion chamber
 
 
 

Model:

ACI-1

Capacity:

500 kg/h - 22h/day

Purpose:

Animal

Delivered: 

-


Medical University, Szeged, Hungary

Complete incineration plant with static combustion chamber
 
 
 

Model:

CS 12

Capacity:

300 kg/h

Purpose:

Hospital waste

Delivered: 

2000


Lawson Mardon Seleprint SRL, Lainate Milano, Italy

Incineration plant with rotary kiln, heat recovery by diathermic oil and dry flue gas treatment
 
 
 

Model:

RK 21

Capacity:

500 kg/h - 24h/day, 2.8 MW

Purpose:

Lithographic (Paper, aluminum, foils, plastic, paint and wood)

Delivered: 

1998


Leather Factory of Riazan, Riazan, Russia

Incineration plant with rotary kiln
 
 
 

Model:

-

Capacity:

2000 kg/h - 24h, 4.5 MW

Purpose:

Waste from Leather production

Delivered: 

1996


Nove Mesto, Czech Republic

Incineration plant with static combustion chamber, heat exchanger, dry & wet flue gas purification, control & monitoring
 
 
 

Model:

-

Capacity:

160 kg/h, 850’000 kcal/h - 24h/day

Purpose:

Industrial waste from a ski factory, mainly plastics

Delivered: 

1996


Vseobena Masaykova, Trutnov, Czech Republic

Incineration plant with static combustion chamber, heat exchanger, tower washer, dry flue gas treatment, control and monitoring
 
 
 

Model:

-

Capacity:

50 kg/h, 175’000 kcal/h - 16h/day

Purpose:

Hospital waste

Delivered:   

1996


Valcoven Plechu, Frydek Mistek

Incineration plant with static combustion chamber
 
 
 

Model:

-

Capacity:

300 kg/day

Purpose:

Industrial, Hospital Waste

Delivered:   

1995


Transporta, Chrudin, Czech Republic

Incineration plant with static combustion chamber, heat exchanger, tower washer, gas / gas heat exchanger, dry flue gas treatment, control and monitoring
 
 
 

Model:

-

Capacity:

250 kg/h, 700’000 kcal/h - 24 h/day

Purpose:

Solid & liquid industrial waste (Oils, paint fabric, PCD)

Delivered:   

1993